Startsida601615 • SHA
add
Ming Yang Smart Energy Group Ltd
Föregående stängning
10,48 ¥
Dygnsintervall
10,38 ¥ - 10,77 ¥
Årsintervall
7,85 ¥ - 15,13 ¥
Börsvärde
23,58 md CNY
Genomsnittlig volym
25,87 mn
P/E-tal
510,06
Direktavkastning
2,86 %
Primär börs
SHA
Aktuellt
Ekonomi
Resultaträkning
Intäkter
Nettoinkomst
(CNY) | sep. 2024info | Förändring Y/Y |
---|---|---|
Intäkter | 8,44 md | −19,39 % |
Rörliga kostnader | 1,05 md | 20,16 % |
Nettoinkomst | 147,85 mn | −74,57 % |
Nettovinstmarginal | 1,75 | −68,47 % |
Vinst per aktie | — | — |
EBITDA | 114,39 mn | −84,94 % |
Giltig skattesats | 19,27 % | — |
Balansräkning
Totala tillgångar
Totala ansvarsskyldigheter
(CNY) | sep. 2024info | Förändring Y/Y |
---|---|---|
Kontanta och kortsiktiga investeringar | 11,18 md | 8,31 % |
Totala tillgångar | 82,92 md | 2,44 % |
Totala ansvarsskyldigheter | 54,68 md | 4,96 % |
Totala tillgångar | 28,24 md | — |
Utestående aktier | 2,15 md | — |
P/B | 0,83 | — |
Avkastning på tillgångar | −0,43 % | — |
Avkastning på kapital | −0,78 % | — |
Kassaflöde
Förändring i nettokassa
(CNY) | sep. 2024info | Förändring Y/Y |
---|---|---|
Nettoinkomst | 147,85 mn | −74,57 % |
Kontanter från verksamhet | −84,38 mn | −108,15 % |
Kontanter från investering | −707,83 mn | 65,13 % |
Kontanter från finansiering | 279,79 mn | −85,43 % |
Förändring i nettokassa | −536,50 mn | −158,65 % |
Fritt kassaflöde | −8,15 md | −337,65 % |
Om
Ming Yang Wind Power Group Limited is the largest private wind turbine manufacturer in China and the fifth largest overall in the country. The company was listed on the New York Stock Exchange from October 1, 2010 to June 22, 2016. It is developing the world's largest wind turbine with a capacity of 18 MW.
The company focuses on designing, manufacturing, selling and servicing megawatt-class wind turbines. Ming Yang cooperates with aerodyn Energiesysteme GmbH, a wind turbine and rotor blade engineering company based in Germany. Ming Yang's key customers include the five largest state-owned power producers in China, with an aggregate installed capacity accounting for more than 5.5% of China's newly installed capacity in 2010.
The company started wind turbine production in 2007, with a prototype of 1.5 MW designed by aerodyn.
In 2010, Ming Yang started SCD production. The SCD is an innovative two blade turbine by aerodyn. In 2013, the new offshore SCD 6.5 wind turbine was presented. A two bladed downwind offshore turbine with helicopter deck. The first was connected to the grid in 2015.
Larger models are expected, and 12 MW is under development. Wikipedia
Grundades
2 juni 2006
Hemsida
Anställda
13 500