Pàgina d'iniciGET • EPA
add
Getlink
Tancament anterior
15,35 €
Interval de preus d'avui
15,41 € - 15,81 €
Interval anual
14,89 € - 17,35 €
Capitalit. borsària
8492,43 M EUR
Volum mitjà
566,72 k
Ràtio PER
24,77
Rendibilitat per dividend
3,50 %
Borsa principal
EPA
A les notícies
Finances
Balanç de resultats
Ingressos
Ingressos nets
(EUR) | juny del 2024info | Variació interanual |
---|---|---|
Ingressos | 404,00 M | -13,49 % |
Despesa d'explotació | 61,00 M | 0,00 % |
Ingressos nets | 86,50 M | 8,81 % |
Marge de benefici net | 21,41 | 25,79 % |
Benefici per acció | — | — |
Ebitda | 211,50 M | -14,72 % |
Taxa impositiva efectiva | -9,49 % | — |
Balanç
Actiu total
Passiu total
(EUR) | juny del 2024info | Variació interanual |
---|---|---|
Efectiu i invers. a curt terme | 1497,00 M | 15,72 % |
Actiu total | 9026,00 M | 2,10 % |
Passiu total | 6641,00 M | 1,38 % |
Capital total | 2385,00 M | — |
Accions en circulació | 541,64 M | — |
Ràtio cotització-valor | 3,49 | — |
Rendiment | 4,18 % | — |
Rendibilitat d'inversió | 4,64 % | — |
Flux de caixa
Variació neta de l'efectiu
(EUR) | juny del 2024info | Variació interanual |
---|---|---|
Ingressos nets | 86,50 M | 8,81 % |
Efectiu d'operacions | 228,50 M | -15,21 % |
Efectiu d'inversió | -33,00 M | -26,92 % |
Efectiu de finançament | -208,00 M | -3,48 % |
Variació neta de l'efectiu | -8,00 M | -116,33 % |
Flux de caixa lliure | 88,56 M | -25,81 % |
Informació
Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel.
Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments. The tunnel was constructed between 1988 and 1994 by TransManche Link under a contract issued by Groupe Eurotunnel; construction costs would overrun considerably, from TML's original estimate of £4.7 billion to the final cost of £9.5 billion. On 6 May 1994, the completed tunnel was officially opened. Its rail infrastructure comprises 50.45 kilometres of double track railway in the main tunnels, plus extensive surface-level terminal facilities at Folkestone in England and Calais in France. The rail network for operation of the Eurotunnel Shuttle train services is entirely self-contained, with connections near the two terminals to the respective national railway networks. Wikipedia
Conseller delegat, CO
Data de fundació
13 d’ag. 1986
Seu principal
Lloc web
Empleats
3.375