PagrindinisGET • EPA
add
Eurotunelis
Ankstesnė uždarymo kaina
15,35 €
Dienos intervalas
15,41 € - 15,81 €
Metų intervalas
14,89 € - 17,35 €
Bendroji vertė rinkoje
8,49 mlrd. EUR
Vidutinė prekybos apimtis
566,72 tūkst.
Kainos ir pajamų santykis
24,77
Pajamos iš dividendų
3,50 %
Pagrindinė akcijų birža
EPA
Aktualios naujienos
Finansiniai rodikliai
Pajamų ataskaita
Pajamos
Grynosios pajamos
(EUR) | 2024-06info | Metinis pokytis |
---|---|---|
Pajamos | 404,00 mln. | −13,49 % |
Veiklos sąnaudos | 61,00 mln. | 0,00 % |
Grynosios pajamos | 86,50 mln. | 8,81 % |
Grynojo pelno marža | 21,41 | 25,79 % |
Pelnas tenkantis vienai akcijai | — | — |
EBITDA | 211,50 mln. | −14,72 % |
Taikomas mokesčio tarifas | −9,49 % | — |
Balansas
Visas turtas
Visi įsipareigojimai
(EUR) | 2024-06info | Metinis pokytis |
---|---|---|
Lėšos, trump. investicijos | 1,50 mlrd. | 15,72 % |
Visas turtas | 9,03 mlrd. | 2,10 % |
Visi įsipareigojimai | 6,64 mlrd. | 1,38 % |
Visos paprastosios akcijos | 2,38 mlrd. | — |
Išleistos akcijos | 541,64 mln. | — |
Kaina / apskaitinė vertė | 3,49 | — |
Turto grąža | 4,18 % | — |
Kapitalo grąža | 4,64 % | — |
Pinigų srautas
Grynasis pokytis (grynaisiais pinigais)
(EUR) | 2024-06info | Metinis pokytis |
---|---|---|
Grynosios pajamos | 86,50 mln. | 8,81 % |
Pinigai iš operacijų | 228,50 mln. | −15,21 % |
Pinigai iš investicijų | −33,00 mln. | −26,92 % |
Pinigai iš finansavimo | −208,00 mln. | −3,48 % |
Grynasis pokytis (grynaisiais pinigais) | −8,00 mln. | −116,33 % |
Laisvas pinigų srautas | 88,56 mln. | −25,81 % |
Apie
Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel.
Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments. The tunnel was constructed between 1988 and 1994 by TransManche Link under a contract issued by Groupe Eurotunnel; construction costs would overrun considerably, from TML's original estimate of £4.7 billion to the final cost of £9.5 billion. On 6 May 1994, the completed tunnel was officially opened. Its rail infrastructure comprises 50.45 kilometres of double track railway in the main tunnels, plus extensive surface-level terminal facilities at Folkestone in England and Calais in France. The rail network for operation of the Eurotunnel Shuttle train services is entirely self-contained, with connections near the two terminals to the respective national railway networks. Wikipedia
Generalinis direktorius
Įkurta
1986-08-13
Pagrindinė būstinė
Svetainė
Darbuotojų skaičius
3 375