Página inicialGET • VIE
add
Getlink SE
Último fechamento
€ 15,65
Variações de hoje
€ 15,43 - € 15,43
Variações do ano
€ 15,01 - € 17,32
Capitalização de mercado
8,48 bi EUR
Volume médio
4,00
Índice P/L
24,35
Rend. de dividendos
3,56%
Bolsa principal
EPA
Notícias sobre o mercado
Finanças
Demonstração de resultados
Receita
Renda líquida
(EUR) | jun. de 2024info | Variação ano a ano |
---|---|---|
Receita | 404,00 mi | -13,49% |
Gastos operacionais | 61,00 mi | 0,00% |
Renda líquida | 86,50 mi | 8,81% |
Margem de lucro líquida | 21,41 | 25,79% |
Lucros por ação | — | — |
LAJIDA | 211,50 mi | -14,72% |
Carga tributária efetiva | -9,49% | — |
Planilha de balanço
Total de ativos
Total de passivos
(EUR) | jun. de 2024info | Variação ano a ano |
---|---|---|
Dinheiro e investimentos de curto prazo | 1,50 bi | 15,72% |
Total de ativos | 9,03 bi | 2,10% |
Total de passivos | 6,64 bi | 1,38% |
Capital próprio | 2,38 bi | — |
Ações em circulação | 541,64 mi | — |
Preço/Valor Patrimonial | 3,56 | — |
Retorno sobre ativos | 4,18% | — |
Retorno sobre capital | 4,64% | — |
Fluxo de caixa
Variação líquida em dinheiro
(EUR) | jun. de 2024info | Variação ano a ano |
---|---|---|
Renda líquida | 86,50 mi | 8,81% |
Dinheiro das operações | 228,50 mi | -15,21% |
Dinheiro de investimentos | -33,00 mi | -26,92% |
Dinheiro de financiamentos | -208,00 mi | -3,48% |
Variação líquida em dinheiro | -8,00 mi | -116,33% |
Fluxo de caixa livre | 88,56 mi | -25,81% |
Sobre
Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel.
Groupe Eurotunnel was established on 13 August 1986 to finance, build, and operate the Channel Tunnel under a concession granted by the French and British governments. The tunnel was constructed between 1988 and 1994 by TransManche Link under a contract issued by Groupe Eurotunnel; construction costs would overrun considerably, from TML's original estimate of £4.7 billion to the final cost of £9.5 billion. On 6 May 1994, the completed tunnel was officially opened. Its rail infrastructure comprises 50.45 kilometres of double track railway in the main tunnels, plus extensive surface-level terminal facilities at Folkestone in England and Calais in France. The rail network for operation of the Eurotunnel Shuttle train services is entirely self-contained, with connections near the two terminals to the respective national railway networks. Wikipedia
Data da fundação
13 de ago. de 1986
Site
Empregados
3.375