Laman UtamaMEG • TSE
add
MEG Energy Corp
Tutup sebelumnya
$24.71
Julat tahun
$22.79 - $33.70
Permodalan pasaran
6.67B CAD
Bilangan Purata
1.70J
Nisbah P/E
13.42
Hasil dividen
1.62%
Pertukaran utama
TSE
Kewangan
Penyata Pendapatan
Hasil
Pendapatan bersih
(CAD) | Sep 2024info | Perubahan T/T |
---|---|---|
Hasil | 1.26B | -12.03% |
Perbelanjaan pengendalian | 422.00J | 0.48% |
Pendapatan bersih | 167.00J | -32.93% |
Margin untung bersih | 13.20 | -23.79% |
Pendapatan bagi setiap syer | 0.62 | -35.38% |
EBITDA | 387.00J | -26.43% |
Kadar cukai berkesan | 21.96% | — |
Kunci Kira-kira
Jumlah aset
Jumlah liabiliti
(CAD) | Sep 2024info | Perubahan T/T |
---|---|---|
Pelaburan tunai dan jangka pendek | 179.00J | 27.86% |
Jumlah aset | 6.69B | -6.38% |
Jumlah liabiliti | 2.08B | -17.13% |
Jumlah ekuiti | 4.61B | — |
Syer tertunggak | 263.00J | — |
Harga kepada buku | 1.43 | — |
Pulangan pada aset | 8.33% | — |
Pulangan pada modal | 9.87% | — |
Aliran Tunai
Perubahan bersih dalam tunai
(CAD) | Sep 2024info | Perubahan T/T |
---|---|---|
Pendapatan bersih | 167.00J | -32.93% |
Tunai daripada operasi | 441.00J | 32.83% |
Tunai daripada pelaburan | -121.00J | 3.20% |
Tunai daripada pembiayaan | -245.00J | -61.18% |
Perubahan bersih dalam tunai | 72.00J | 22.03% |
Aliran tunai bebas | 289.75J | 249.10% |
Perihal
MEG Energy is a pure play Canadian oil sands producer engaged in exploration in Northern Alberta. All of its oil reserves are more than 1,000 feet below the surface, so they depend on steam-assisted gravity drainage and associated technology to produce. The company's main thermal project is Christina Lake. 85-megawatt cogeneration plants are used to produce the steam used in SAGD which is required to bring bitumen to the surface. The excess heat and electricity produced at its plants is then sold to Alberta's power grid. Its proven reserves have been independently pegged at 1.7 billion barrels and probable reserves 3.7 billion barrels; That's significant considering only 300 billion barrels of the 1.6 trillion barrels of bitumen in Alberta is considered recoverable under current technology. The value of those reserves is over $19.8 billion. CNOOC has a minority 16.69% interest in MEG Energy.
Within nine months of going public it reached large cap company status after a small cap ipo. As recently as 2007 it was a junior oil company. Wikipedia
Diasaskan
1999
Ibu pejabat
Tapak web
Pekerja
450