Laman UtamaVISASTEEL • NSE
add
Visa Steel Ltd
Tutup sebelumnya
₹35.23
Julat hari
₹33.46 - ₹33.46
Julat tahun
₹15.20 - ₹37.02
Permodalan pasaran
3.88B INR
Bilangan Purata
18.97K
Nisbah P/E
-
Hasil dividen
-
Pertukaran utama
NSE
Berita pasaran
Kewangan
Penyata Pendapatan
Hasil
Pendapatan bersih
(INR) | Sep 2024info | Perubahan T/T |
---|---|---|
Hasil | 1.51B | -20.40% |
Perbelanjaan pengendalian | 603.99J | -14.92% |
Pendapatan bersih | -41.55J | 83.14% |
Margin untung bersih | -2.76 | 78.82% |
Pendapatan bagi setiap syer | — | — |
EBITDA | 78.69J | 239.65% |
Kadar cukai berkesan | — | — |
Kunci Kira-kira
Jumlah aset
Jumlah liabiliti
(INR) | Sep 2024info | Perubahan T/T |
---|---|---|
Pelaburan tunai dan jangka pendek | 257.18J | 22.75% |
Jumlah aset | 10.19B | -3.32% |
Jumlah liabiliti | 18.74B | 0.52% |
Jumlah ekuiti | -8.55B | — |
Syer tertunggak | 115.42J | — |
Harga kepada buku | -0.48 | — |
Pulangan pada aset | — | — |
Pulangan pada modal | -1.92% | — |
Aliran Tunai
Perubahan bersih dalam tunai
(INR) | Sep 2024info | Perubahan T/T |
---|---|---|
Pendapatan bersih | -41.55J | 83.14% |
Tunai daripada operasi | — | — |
Tunai daripada pelaburan | — | — |
Tunai daripada pembiayaan | — | — |
Perubahan bersih dalam tunai | — | — |
Aliran tunai bebas | — | — |
Perihal
VISA Steel Limited is a mineral and metals company situated in the Kalinganagar industrial complex of Jajpur Odisha, India with a 1.5 million ton integrated special and stainless steel manufacturing plant. VISA Steel has its registered office in Bhubaneswar, corporate office in Kolkata and branch offices across India. A listed company, VISA Steel's shares are traded on the BSE and NSE.
The company has set up a 125,000 TPA Ferro Chrome Plant at Kalinganagar in Odisha. The facilities include 5 submerged Arc Furnaces with 3x25 MW Power Generating Units. The company is setting up an integrated 1 million TPA Special and Stainless Steel Plant at Kalinganagar Industrial Complex, Odisha. The first phase of 0.5 million TPA Special Steel Long Product Plant with 75 MW captive power plant is fully operational. The facilities include a 0.4 million TPA Coke Oven Plant, 0.225 million TPA Pig Iron Plant, 0.3 million TPA Sponge Iron Plant, 0.05 million TPA Ferro Chrome Plant, 75 MW captive power plant, 0.5 million TPA Steel Melt Shop and 0.5 million TPA Rolling Mill. Capacity of this plant is planned to be doubled to 1 million TPA. Wikipedia
Diasaskan
1996
Tapak web
Pekerja
319